From a validated scope to GO-LIVE READY.

Fixed price based on validated scope.

Get a QuoteStart with MindDX Assess
Implement is built on a completed Assess and a validated scope. Coming from the new-implementation route, the Blueprint is part of the composition; coming from the live-system route it is NOT added automatically — that would mean producing scope a second time for a system already scanned.

From validated scope to the end state

01 · Capability · commercial scope

Discover Deep Dive

  • In-scope deep analysis

02 · Output · artifact

Gap/Fit + Blueprint

  • Artifact

03 · Capability · commercial scope

Design

  • Configuration guide
  • Technical document
  • Acceptance scenarios

04 · Execution · work inside Implement

Controlled implementation

  • Configuration
  • Necessary adaptation

05 · Execution · work inside Implement

Test and UAT

  • Verification against acceptance criteria

06 · Capability · commercial scope

Train

  • Team readiness

Terminal state

GO-LIVE READY

  • A tested and verified solution, ready for live use.

The customisation order

01

Standard capability first.

Existing functions and the right configuration.

02

Adapt only as much as needed.

Fields, models, access rights and controlled settings.

03

Develop only if necessary.

When standard and adaptation are not enough — justified and controlled.

04

Test it and prove it.

Technical review, a test environment and UAT verification.

How the fixed price works

  1. Assess is completed.
  2. The scope is validated.
  3. An authorised MindDX approver confirms one single fixed Implement total.
  4. You see that total in your account.
  5. The net amount you actually paid for Assess is credited; the remaining balance is shown.

One chain from business need to acceptance evidence

  1. 01Business need
  2. 02Gap/Fit
  3. 03Decision
  4. 04Technical design
  5. 05UAT
  6. 06Evidence

What Implement is not

  • A generic quote editor
  • A man-day sale
  • An automatic continuation into Transform
  • A mandatory next step after every Assess

Which systems we deliver Implement on today

Implement delivery today covers Odoo and abas. On the other systems we measure (Assess) and then discuss implementation. Outside Türkiye, delivery runs with partners.

We can measure these systems: Odoo ERP, Zoho CRM, abas ERP, Pipedrive CRM, Freshworks.

We deliver Implement ourselves for Odoo ERP · abas ERP today; for the others we discuss the implementation with you first.

We have a partnership with ProcessMind for TR + Azerbaycan, and it is evidenced on file.

A system listed here means we can measure it. Who delivers the implementation and who we have a partnership with are two SEPARATE questions; putting all three in one sentence would imply a channel that does not exist.

Frequently Asked Questions

About the products

Why is there no price for Implement?
Because the price follows the scope, and the scope is not validated until Assess is complete. Once it is, one single fixed Implement total is approved and appears in your account. A figure published in advance would be a promise made about an unknown scope.
Is Implement mandatory after the live-system route?
No. Measuring a live system does not require a follow-on project; the measurement may well say that no action is needed. Implement is not the default next step.
Why do ERP projects go over budget?
Budgets usually break not from one big mistake but from the same mechanism repeating: the work is priced before the scope is written down. The contract commits capacity (man-days) while the scope emerges as the project runs; every new discovery becomes a change request and every request becomes extra days. Three typical sources: (1) unrecorded processes — side spreadsheets, informal approvals, a different flow in the warehouse; (2) data migration — legacy data not being in the expected shape, usually seen in testing; (3) decision delays — a business decision left open causes the same work to be done twice once development has started. All three trace to one common cause: the scope was discovered AFTER the commitment. MindDX reverses that order — the price is built on a validated scope.
What should be prepared before an ERP implementation?
Five preparations come before any technical setup. (1) Decision ownership: who decides for each process must be written down; a process with no name attached stalls mid-project. (2) Data condition: master data (customers, products, stock, suppliers) must be de-duplicated and its missing fields known in advance — migration is measured in preparation, not in testing. (3) Process inventory: how the business actually runs today, written down, unrecorded flows included. (4) Scope decisions: every gap already decided as "customise / change the process / out of scope". (5) User readiness: which role uses which screen and how, settled before training. Without these five a project can start, but the scope will surface later. At MindDX the first four sit inside Assess and the fifth inside Implement.
What is an ERP Blueprint?
A Blueprint is the written answer to "what exactly are we building" in an ERP project: the target state of the processes, which system function covers each process step, the fit/gap decisions, and the reason behind each decision. It is not a feature list — lists say what will be asked for, a Blueprint says how things will WORK. A good Blueprint carries three things together: (a) the target process flow, (b) the matching system configuration, (c) what was left out of scope and why. The third is the one most often skipped and the most expensive to skip: an "out of scope" that was never written down comes back later as a "forgotten requirement". At MindDX the Blueprint is the output of Discover and the input to Implement — not a presentation file, but the document the implementation rests on.